LESSON

Lesson Learned: Development Pacts: An accountability tool in the hands of local communities in Kyrgyzstan

The service monitoring arrangements secured on-the-spot verification of the actual implementation of commitments made under the Development Pacts, including the compliant use of allocated funds. Most project beneficiaries expressed their high satisfaction with this monitoring process, and described it as inclusive, as it involved all members of the local community in the verification of completeness and quality of services.
Project Partner
Transparency International Kyrgyzstan
Project Description
The project motivated both the local population and local government in Kyrgyzstan to jointly assess community needs and to jointly prioritize actions addressing the most pressing concerns within the limits of available resources. The approach of putting a monitoring system in place was implemented by Voluntary Citizen Committees (VCCs), as well as by local authorities. Having generated 16 project-driven and 37 beneficiary-driven Development Pacts (DP), of which most have already produced tangible results, the grantee significantly contributed to an improved responsiveness of local authorities in Kyrgyzstan to citizens’ concerns.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Renforcement des capacités de formation en leadership pour renforcer la participation des femmes dans la vie publique (Algérie)

While the project was relevant at the time it was conceived and implemented, the introduction of quotas for women in Algeria significantly changed the status quo after 2012. It is not possible to gauge whether the projected multiplier effect did in fact take place. Nor is it possible to judge with absolute certainty whether participation in the project actually prompted more women to stand for election at any level.
Project Partner
AMUSNAW
Project Description
The project’s principal objective was to build the capacity of women who are involved in NGOs, trade unions and political parties so that they have the confidence to participate in governance, particularly in local bodies in Algeria. This was to be achieved through leadership training in eight districts for at least 500 women; and a series of four seminars on women’s role in public life for at least 300 women. While the project was relevant, it was only partly effective, not efficient and difficult to judge its impact and sustainability.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Development Pacts: An accountability tool in the hands of local communities in Kyrgyzstan

Beneficiaries explained their motivation to continue applying the Development Pact process with the simplicity of the methodology used to identify and prioritize local issues, which basically established the problem, its frequency and the ability to solve the issue. Each aspect was weighed in points (on a scale from 0 to 10), and a comparison of an issue’s total score served to rank / prioritize the different identified local issues.
Project Partner
Transparency International Kyrgyzstan
Project Description
The project motivated both the local population and local government in Kyrgyzstan to jointly assess community needs and to jointly prioritize actions addressing the most pressing concerns within the limits of available resources. The approach of putting a monitoring system in place was implemented by Voluntary Citizen Committees (VCCs), as well as by local authorities. Having generated 16 project-driven and 37 beneficiary-driven Development Pacts (DP), of which most have already produced tangible results, the grantee significantly contributed to an improved responsiveness of local authorities in Kyrgyzstan to citizens’ concerns.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Renforcement des capacités de formation en leadership pour renforcer la participation des femmes dans la vie publique (Algérie)

One of the expected mechanisms of sustainability foreseen – the training of trainers – did not take place. The concrete outputs – a video documentary and a “study” based on an opinion poll – are not of sufficient quality to be usable in Algeria. Although some of the women who participated came together in an informal “network”, experience suggests that the sustainability of such a network will depend entirely on the efforts of those involved in it and/or of a strategic approach to its maintenance by the grantee.
Project Partner
AMUSNAW
Project Description
The project’s principal objective was to build the capacity of women who are involved in NGOs, trade unions and political parties so that they have the confidence to participate in governance, particularly in local bodies in Algeria. This was to be achieved through leadership training in eight districts for at least 500 women; and a series of four seminars on women’s role in public life for at least 300 women. While the project was relevant, it was only partly effective, not efficient and difficult to judge its impact and sustainability.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Development Pacts: An accountability tool in the hands of local communities in Kyrgyzstan

Despite clearly specified indicators in the results framework the grantee lacked pertinent data demonstrating the extent to which women and vulnerable groups in Kyrgyzstan have been given specific opportunity to negotiate their demands and exercise their rights.
Project Partner
Transparency International Kyrgyzstan
Project Description
The project motivated both the local population and local government in Kyrgyzstan to jointly assess community needs and to jointly prioritize actions addressing the most pressing concerns within the limits of available resources. The approach of putting a monitoring system in place was implemented by Voluntary Citizen Committees (VCCs), as well as by local authorities. Having generated 16 project-driven and 37 beneficiary-driven Development Pacts (DP), of which most have already produced tangible results, the grantee significantly contributed to an improved responsiveness of local authorities in Kyrgyzstan to citizens’ concerns.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Strengthening Governance and Democratization Processes in Kenya and the East and Central Africa Region

The grantee undertook 12 workshops in different counties to train individuals from community and faith based organizations on election observation. This two-day training was effective and useful since the participants shared the information about electoral monitoring and participation with their organizations and networks following the training.
Project Partner
Institute For Education In Democracy
Project Description
The main objective of the project was to strengthen the capacity grassroots organizations, and enhance the participation of citizens in governance to promote a democratic culture in Kenya and in eastern and central Africa. While some project activities were highly relevant and empowering to individual beneficiaries, others lacked follow-up. Among the project’s successes were the election observation trainings which had a multiplier effect with grassroots organizations. Following the workshop trainings, 12 observation groups were established to monitor the Kenyan election of 2013, all of which later obtained a long-term accreditation status as election observers. In general, the project was activity-driven which made outcomes and institutional impact difficult to assess. Project design showed some weaknesses, as several challenges that appeared during implementation could have been anticipated by the grantee beforehand. For example, the shortage of staff and a better coordination with the electoral timeline in Kenya could have ensured a smoother implementation.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Renforcement des capacités de formation en leadership pour renforcer la participation des femmes dans la vie publique (Algérie)

The grantee persisted with the organization of training and seminars even when it became obvious, early in the project, that a shift in the exchange rate in Algeria would leave the project short of funds. The grantee became aware early in the project that a shift in the exchange rate would leave the project under-resourced but did nothing to review the workplan.
Project Partner
AMUSNAW
Project Description
The project’s principal objective was to build the capacity of women who are involved in NGOs, trade unions and political parties so that they have the confidence to participate in governance, particularly in local bodies in Algeria. This was to be achieved through leadership training in eight districts for at least 500 women; and a series of four seminars on women’s role in public life for at least 300 women. While the project was relevant, it was only partly effective, not efficient and difficult to judge its impact and sustainability.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Development Pacts: An accountability tool in the hands of local communities in Kyrgyzstan

Another reason for the smooth introduction of the new process was the clear and easy-to-use Development Pact (DP) template structure, which comprised of: introduction (topic and monitoring committee purpose agreed upon), definition of the DP priority, description of the issue and how to address it, identification of partners involved (including their inputs) in implementing the DP, clarification of financing (including in-kind contribution), purpose of monitoring, activity plan and deadline for DP completion (including target indicators and schedule for monitoring purposes).
Project Partner
Transparency International Kyrgyzstan
Project Description
The project motivated both the local population and local government in Kyrgyzstan to jointly assess community needs and to jointly prioritize actions addressing the most pressing concerns within the limits of available resources. The approach of putting a monitoring system in place was implemented by Voluntary Citizen Committees (VCCs), as well as by local authorities. Having generated 16 project-driven and 37 beneficiary-driven Development Pacts (DP), of which most have already produced tangible results, the grantee significantly contributed to an improved responsiveness of local authorities in Kyrgyzstan to citizens’ concerns.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Strengthening Governance and Democratization Processes in Kenya and the East and Central Africa Region

While developing an electoral knowledge resource in Swahili seemed to be a good use of resources, this was not the case since there was no demonstrated need for this resource in Swahili and the targeted beneficiaries were not made aware that the website and translations existed. Use statistics of the website were low and none of the Kenyans interviewed outside of the grantee knew the translations existed. The Kenyans interviewed said they relied on English technical material because Swahili is still a developing language and does not have the technical vocabulary.
Project Partner
Institute For Education In Democracy
Project Description
The main objective of the project was to strengthen the capacity grassroots organizations, and enhance the participation of citizens in governance to promote a democratic culture in Kenya and in eastern and central Africa. While some project activities were highly relevant and empowering to individual beneficiaries, others lacked follow-up. Among the project’s successes were the election observation trainings which had a multiplier effect with grassroots organizations. Following the workshop trainings, 12 observation groups were established to monitor the Kenyan election of 2013, all of which later obtained a long-term accreditation status as election observers. In general, the project was activity-driven which made outcomes and institutional impact difficult to assess. Project design showed some weaknesses, as several challenges that appeared during implementation could have been anticipated by the grantee beforehand. For example, the shortage of staff and a better coordination with the electoral timeline in Kenya could have ensured a smoother implementation.
Evaluation Date
November 2013
Country
LESSON

Lesson Learned: Your Local Representative, Strengthening Citizen Participation in Ukraine

The project’s technique of putting in place governance transparency activities at local level in different regions could be replicated in future as the focus on local issues and representatives, should be leveraged to achieve a national impact. Outcome indicators should also be adopted in projects such as these so the information can be used to better target project activities and improve project performance.
Project Partner
East Europe Foundation
Project Description
The project sought to enhance the capacities of Ukrainian NGOs and citizens to influence political processes by providing citizens with tools to monitor and evaluate the work of their elected officials and to advocate for needed change. Its intended outcomes were to: increase NGO activism in engaging citizens to undertake citizen monitoring and advocacy activities; increase access to information for citizens about their local representatives and electoral officials; and increase civil society demand for more accountability from their local representatives and elected officials in eight targeted regions. The main tool used by the project to achieve these outcomes was a dedicated website. However this was under-developed in the design and during implementation. The assumption that these websites alone could result in more responsive party lists or more accountable deputies was unrealistic .The impact of this project is difficult to assess as it did not collect outcome information.. The limited use of the site and its lack of links to activities in the sector reduced its potential for impact but from the anecdotal information gathered, it seems that on a limited scale, this project resulted in an increased awareness among some deputies that their activities were being watched and that information on their work could get out to the public through NGOs and websites such as these.
Evaluation Date
October 2013
Country